Location
On the A9 near Moy Rail Bridge and the current realignment in place at Lynebeg.
Description
Temporary traffic signals and a short 200m lane closure will be implemented on the A9 near Moy Rail Bridge and the current realignment in place at Lynebeg. These are to facilitate culvert installations and sheet piling.
Road users will be stopped at the temporary traffic signals before being guided through an approximately 200 metre long lane closure at a reduced speed limit of 30mph, before continuing their journey at the signposted speed limit. These measures are necessary to ensure the safety of our workforce and road users as works will be carried out in close proximity to the A9.
Date and time:
The traffic signals will be in place for approximately two weeks from Monday 3 November 2025 between the hours of 07:30 and 21:30. There will be no work carried out on Saturday or Sundays.